Calculating general procedures (PrT and PuT)
Some of the procedures that can be selected for the procedure sequence apply to both private transport and public transport:
- Deleting PrT/PuT assignment results
- Analyzing the assignment quality
- Calculating basic territory indicators
- Distribution of demand matrix to paths
Note: Specific PrT procedures and specific PuT procedures are described separately.
|